Muir Omni Graphics

This project consisted of a full replacement of an existing spray polyurethane foam roofing system across multiple buildings, requiring extensive demolition, substrate preparation, and safety coordination. Work began with installation of compliant guardrail and fall protection systems.

The existing SPF roofing system was fully removed down to the structural deck, including removal from perimeter walls while preserving existing clay tile caps. Roof access framing was modified, and new wood blocking and insulation were installed to match existing roof elevations.

After deck inspection and selective material replacement, a 2-inch polyisocyanurate insulation layer was mechanically fastened to the deck, followed by installation of a 60-mil white TPO membrane. All seams, penetrations, and flashings were detailed per manufacturer specifications. The project was completed with a 20-year manufacturer membrane warranty and a 5-year transferable River City Roofing workmanship warranty.

PRODUCTS USED

SIZE

32,100 square feet

SQUARES

321 squares

Scroll to Top