PH Executive Plaza

This project required a hybrid roofing approach to balance modern performance requirements with preservation considerations on a historically significant structure. River City Roofing completed a full tear-off replacement on the upper roof while installing a mechanically fastened TPO layover system on the middle roof.

The upper roof assembly was removed down to the metal deck and rebuilt with two layers of 2.6-inch polyisocyanurate insulation to achieve thermal performance and slope continuity. A 60-mil white TPO membrane was mechanically fastened and terminated beneath existing copper flashings using termination bars to maintain watertight integration with historic detailing.

The middle roof received a mechanically attached layover system consisting of a high-density cover board fastened through the existing assembly into the metal deck, followed by a new TPO membrane fully detailed at all perimeters, penetrations, and drains. All work was completed in accordance with manufacturer specifications and industry standards while minimizing disruption to the existing structure.

PRODUCTS USED

SIZE

7,500 square feet

SQUARES

75 squares

Scroll to Top